Upgrading of highway GC-2. Arucas – Pagador Junction. Gran Canaria

“Increased capacity and safety for the road”

The upgrading of the GC-2. Section: Arucas-Pagador Junction is a new contribution to the solution of the traffic problems in this section.

The total length of the Arucas – El Pagador section, where Azierta was in charge of the supervision of the construction of the different Project Units is 7.1 km and the greatest investment went to the Arucas junction and the Bañaderos traffic circle with 3.5 km.

This section has a specific speed of 50 miles/hour. Work focused on the extension of the platform to make the highway wider (from 11 to 18 meters) and a dual carriageway system and shoulders, thus improving the safety of the highway.

Technical characteristics

  1. Extension of the platform between Bañaderos Traffic circle and Arucas Junction
  2. Other roads. Road to El Altillo
  3. Pavements
  4. Walls
  5. Structures
  6. Drainage
  7. Lighting

News, Links:

Article from “Gobierno de Canarias” (Spanish)

Article of interest (Spanish)

Article form “El Diario” (Spanish)